Grounded Electrical Construction is an award winning full-service electrical contractor serving commercial and institutional clients in Maryland, D.C. and Virginia. The following is an overview of the variety of projects we've built. 

Public Schools

AACPS: Strategic Lighting at Meade and Northeast Middle Schools

11/8/2023

Grounded Electrical Construction has been awarded the Anne Arundel County Public Schools Strategic Lighting at Meade and Northeast Middle Schools project. Over the summer of 2024, the Grounded team will be replacing light fixtures and lighting control in select areas of both of these Middle Schools. Once completed, these spaces will have upgraded energy efficient dimmable LED light fixtures with networked digital lighting controls. 

read more

Main Distribution Center & Panelboards Replacement at Central Elementary School

10/24/2023

Grounded Electrical Construction has been awarded the Main Distribution Center & Panelboards Replacement at Central Elementary School project from Anne Arundel County Public Schools. Over the next couple of years due to extensive equipment lead times, the Grounded team will be replacing the medium-voltage transformer, main switchboard, panelboards, and dry-type transformers. Once completed, the school will have safe, modern and reliable electrical switchgear.

read more

Main Distribution Center Replacement at Oak Hill Elementary School

10/24/2023

Grounded Electrical Construction has been awarded the Main Distribution Center Replacement at Oak Hill Elementary School project from Anne Arundel County Public Schools. Over the next couple of years due to extensive equipment lead times, the Grounded team will be replacing the main switchboard, panelboards, and dry-type transformers. Once completed, the school will have safe, modern and reliable electrical switchgear.

read more

Deer Park Elementary School

7/17/2023

Baltimore County Public Schools with Dustin Construction as construction manager has awarded Grounded Electrical Construction the 16A - Electrical & Low Voltage Package for the new Deer Park Elementary School in Owings Mills, MD. Construction of the new 2-story, 102,853 square foot elementary school is anticipated to start in August 2023 and be completed by May 2025. Once completed, this will be Baltimore County Public Schools ...

read more

AACPS: Strategic Lighting Upgrades at Two Middle Schools

4/28/2023

Grounded Electrical Construction has been awarded the Anne Arundel County Public Schools Strategic Lighting at Two Schools project. Over the next few months, the Grounded team will be replacing light fixtures and lighting control in select areas of Brooklyn Park Middle School and Southern Middle School. Once completed, these spaces will have upgraded energy efficient dimmable LED light fixtures with networked digital lighting controls. 

read more

CCPS Elementary School #23

4/21/2023

Keller Brothers has chosen Grounded Electrical Construction to perform the electrical (Division 26) and low voltage (Divisions 27 & 28) scope of work for Charles County Public Schools Elementary School #23. Construction of this new, 2-story 95,000 square foot elementary school is anticipated to start in April 2023 and be completed in April 2025. Once completed, this elementary school will have a capacity of 760 ...

read more

Bedford Elementary School

6/23/2022

Baltimore County Public Schools with Keller Brothers as construction manager has awarded Grounded Electrical Construction the 16A electrical contract for the construction of Bedford Elementary School in Baltimore, MD. Construction of the new 2-story, 102,449 square foot elementary school is anticipated to start July 2022 and be completed by July 2025 . The construction of the new elementary school will to replace the existing elementary ...

read more

Old Mill Middle School South

4/25/2022

Anne Arundel County Public Schools, with CBRE Heery as construction manager has awarded Grounded Electrical Construction the electrical subcontract for the construction of Old Mill Middle School South in Millersville, MD. This is a new 158,704 square foot, 3-story middle school is starts in May of 2022 with an anticipated completion date of June 2024 . The construction of the new middle school is intended ...

read more

Brunswick Elementary School

2/7/2022

Keller Brothers has awarded Grounded Electrical Construction the electrical subcontract for the construction of Brunswick Elementary School in Brunswick, MD. Construction of this new 95,425 square foot, 2-story elementary school is anticipated to start in April 2021 and be completed in March 2024.  The new facility is designed to increase the schools capacity by 217 seats (725 seats total) and contain Per-K through 5th ...

read more

East Middle School

9/3/2021

Dustin Construction has awarded Grounded Electrical Construction the electrical subcontract for the construction of East Middle School in Westminster, MD. Construction of this new 127,510 square foot, 2-story middle school is anticipated to start in August 2021 and be completed in December 2023. The existing East Middle School was opened in 1936 and served as a high school for 35 years, and a middle ...

read more

Highlandtown Elementary/Middle School

9/1/2021

CAM Construction has awarded Grounded Electrical Construction the 26A electrical subcontract for Highlandtown Elementary/Middle School. The project contains two 3-story additions, totaling 45,000 square feet. The existing building will also be renovated to include new light fixtures and low voltage system upgrades. Anticipated completion date is 12/15/2022.

read more

Generator Replacement at Brooklyn Park Middle School

7/29/2021

Grounded Electrical Construction has been awarded the Generator Replacement at Brooklyn Park Middle School from Anne Arundel County Public Schools. The project involves replacing the existing 100KW diesel generator with a new 100KW natural gas generator and the replacement existing automatic transfer switches with two 100A automatic transfer switches. To acomplish this work, GEC will saw cut and remove existing concrete curbs, sidewalks and asphalt ...

read more

Dowell J. Howard Center Lighting Replacement

6/23/2021

Grounded Electrical Construction has been awarded the contract to replace the existing fluorescent lighting in the Dowell J. Howard Vocational School located in Frederick County, VA with new LED light fixtures.. The scope of work includes providing new light fixtures for shops, classrooms, hallways and administration areas. The project also includes adding occupancy sensors in select areas to improve energy efficiency. Emergency lighting and exit ...

read more

Old Mill West High School

2/4/2021

Grounded Electrical Construction was awarded the 16A-Electrical contract for the multi-prime Anne Arundel County Public Schools - Old Mill West High School project managed by Jacobs. This $18 million dollar  3-year electrical project located in Severn, MD is to construct a new 3-story 301,393 square foot high school with a capacity of 1,882 students along with a stadium building, outdoor storage structures, parking lots ...

read more

Generator Replacement at Broadneck High School & Meade Middle School

12/16/2020

Grounded Electrical Construction has been awarded two generator replacement projects from Anne Arundel County Public Schools at Broadneck High School and Meade Middle School. Both projects involve replacing the existing diesel generators with new natural gas generators, 150KW for Broadneck High School and 200KW for Meade Middle School. Each project also contains gear replacement and relocating existing circuits to be backed-up by the new generators ...

read more

Replace Main Electrical Distribution at Central Special School

8/19/2020

Grounded Electrical Construction is the prime contractor for the Replacment of the Main Electrical Distribution at Central Special School for Anne Arundel County Public Schools. Though the foot print of this work is small  at 437 square feet, this project includes the replacement of the schools incoming medium voltage switch and transformer, as well as the 600V distribution switchboard to ensure electrically reliabilty for years ...

read more

Howard County Public Schools - Guilford Park High School

8/18/2020

Grounded Electrical Construction was awarded the 16A-Electrical contract for the multi-prime Howard County Public Schools - High School #13 project managed by Oak Contracting. This $14 million dollar  3-year electrical project located in Jessup, MD is to construct a new 3-story 289,148 square foot high school along with a stadium building, outdoor storage structure, (3) parking lots with bus loop,  (4) athletic fields, (2) basketball ...

read more

Graceland Park #240 & Holabird Academy #229 Elementary/Middle Schools

12/14/2017

Grounded Electrical Construction performed the division 26, 27 and 28 scope of work for Graceland Park #240 and Holabird Academy #229 Elementary/Middle Schools located in Baltimore, MD. These 2-story 94,332 square foot schools are nearly identical and are roughly one mile away from one another. The only difference in the schools is the building orientation, site work, and one has a fire pump ...

read more

Mount Daniel Elementary School Addition & Renovation

5/31/2017

Grounded Electrical Construction has been selected to perform the electrical and low voltage work for the addition and renovation of Mount Daniel Elementary School in Falls Church, VA. Mount Daniel will be fully operational during construction by utilizing fifteen temporary trailers. Grounded Electrical is responsible to provide temporary power, fire alarm and paging for these trailers. The building work includes a new electrical service, communication ...

read more

Robert Poole Building #56

4/25/2017

Grounded Electrical Construction will complete all of the electrical and low voltage work for the Robert Poole Building #56 (High School). The school was originally built in 1923 and will undergo major renovation and addition.

The school will be 138,500 square feet with four floors. Electrical systems include: house lighting, theater lighting, gear, generator, cable tray, fire alarms, area of refuge, telecommunications, access control ...

read more