HESS Construction awarded Grounded Electrical Construction the electrical subcontract to build DC Waters new 2-story 26,800 square foot fleet maintenance facility in Capitol Heights, MD. This fast paced (330 calendar days) new construction project includes 18 apparatus bays, a wash bay, spaces for tools, tires, battery charging, fluids, parts and storage, along with break rooms, restooms, open offices and a conference room. Grounded Electrical Construction will be performing site utilities, site lighting, interior lighting and controls, gear, fire alarm, lightning protection, wiring devices and low voltage infrastructure.
DC Water Fleet Maintenance
date:
8/18/2020
subjects: